to day we were in the class room all day,
prety lucky really because it was very hottt!!!!! outside and there was air con in the class room.
firstly we started finshing our leveling and setting out booklet,
then we started on a booklet on australian standards on framing AS1684, which was very intresting to know the standards that we work by and what every tradesman should know and work by. then we did some workin out to do with how many bearers , stumps, sole plates and joists we needed 4 wall framing and strip fllooring which was very hard to get around but i got it in the end. we also did some working out to c how much sheet flooring was required 4 a platform floor 4 a building