well its the first day back, we were inside the whole day learning about AS1684 and the rules to do with wall framing . then we went on to do the booklet on sub flooring, at the end of the day we did the maths side of of the wall framing which i found intresting, then paul gave us some home work 4 us to do which i copmpleted...
the next day first thing, we went over our home work together. we went out side to do the setting out on the wall framing , we cut all the plates for the top and bottom for the walls and marked out where all the studs, windows and doors are put. once we did that we cut and placed the rest of the strip floor which was 19mm hardi , water proof concret sheets